Deprecated: Array and string offset access syntax with curly braces is deprecated in /home/psrailyc/public_html/en/engine/classes/templates.class.php on line 211 Feasibility Studies - PSRaily Co. http://psraily.com/en/ fa Feasibility Studies - PSRaily Co. DataLife Engine Inception Report and Traffic Study of Chabahar-Zahedan-Mashhad Railway http://psraily.com/en/index.php?newsid=1056 http://psraily.com/en/index.php?newsid=1056 Goals:
• Primary identifying of the route and infrastructure specifications
• Consideration of Chabahar port position
• Comparison of railway transportation with other transportation methods
• Primary traffic studies]]>
Support Thu, 27 Oct 2016 12:34:36 +0300
Feasibility Study of Increasing the Capacity of Cahadormalou – Ardakan Track http://psraily.com/en/index.php?newsid=1033 http://psraily.com/en/index.php?newsid=1033 Goals:
• Sufficient capacity Ardakan-Chadormalu rout over the coming years
• Survey strategies to increase the capacity of rout
• Selection of the optimal strategy and plan of technical and economic feasibility]]>
Admin Sun, 04 Sep 2016 14:41:57 +0300
Feqasibility Study of Increasing the Capacity of Qom-Badrood Track http://psraily.com/en/index.php?newsid=1032 http://psraily.com/en/index.php?newsid=1032 Goals:
• Determine the capacity and the demand for rail transport in the Qom-Badroud route
• Offering suitable solutions to meet demand over the coming years
• Offering a good way to increase track capacity according to demand and financial assessment plan]]>
Admin Sun, 04 Sep 2016 14:41:41 +0300
Feasibility Study of Rolling Stock Purchasing http://psraily.com/en/index.php?newsid=1031 http://psraily.com/en/index.php?newsid=1031
Purchasing of freight wagon

Purchasing of passenger car

Purchasing of locomotive]]>
Admin Sun, 04 Sep 2016 14:41:23 +0300
Construction Feasibility Study of Bashmaq – Soleimanieh Railway http://psraily.com/en/index.php?newsid=1030 http://psraily.com/en/index.php?newsid=1030 Goals:
• Survey in condition of roads between cities
• Familiarity and reviews based on geography and regional route
• Check the status of the existing topography of the natural terrain
• A preliminary study on the feasibility region in terms of the primary corridor for the passage and construction of railways
• Visual inspection of the facilities and transportation infrastructure around the area
• Exploring the possibility of investing in other things and services such as training, service, industrial, sports, culture, health ... etc.]]>
Admin Sun, 04 Sep 2016 14:41:05 +0300
Construction Feasibility Study of Sanandaj Subway Between Imam Khomeini Square and Sanandaj Airport http://psraily.com/en/index.php?newsid=1029 http://psraily.com/en/index.php?newsid=1029 Goals:
• Increase number of public transport users share
• Not using of costly and temporary solutions
• Creating maximum capacity, taking into account all affecting factors]]>
Admin Sun, 04 Sep 2016 14:40:45 +0300