Running train tracks and equipment studies
This project has been done in 5 phase
In this project following topic has been done:
gathering data for last 10 years in IRAN and also 4 selected country in the word and compare runaway accident
also introduce Equipment prevent and Reduce the effects of runaway train
calculation of The length and slope of runaway lines
Check the terms and explanation of indices for construction of escape lines
The analysis of the level of risk at stations
Factors affecting the course of trains increase safety
Cost estimating solutions for stations
In this project following topic has been done:
gathering data for last 10 years in IRAN and also 4 selected country in the word and compare runaway accident
also introduce Equipment prevent and Reduce the effects of runaway train
calculation of The length and slope of runaway lines
Check the terms and explanation of indices for construction of escape lines
The analysis of the level of risk at stations
Factors affecting the course of trains increase safety
Cost estimating solutions for stations