Goals:
• Decreasing the wagons stoppage on the way because of detecting the probable defects
• Training of the experts in field of train control and inspection
• Creating the control stations in Iran railway network bottleneck points
Goals:
• Designing the quality control system of train wheelset
• Implementing the quality control system of train wheelset
• Wastage decrease, increasing the quality and reliability in train wheelset
Goals:
• Designing the quality control system of train bearings
• Implementing the quality control system of train bearings
• Wastage decrease, increasing the quality and reliability in train bearings
Goals:
• Designing a bearings quality control system for passenger cars maintenance workshop
• Identifying hidden defects for passenger cars bearings
Goals:
• Control, detachment and classification of roller bearings based on kind and intensity
• Packing and storage by a suitable method for maintenance in the future.
Goals:
• Codifying standard of safety audit for passenger cars wheelset
• Implementing of audit
Goals:
• Submitting of Inspection and control reports for railway track
• Submitting of Inspection and control reports for railway machinery
• Submitting of Inspection and control reports for wagons and locomotives